:PROJECT OVERVIEW
LOCATION: 3300 GALLOWS ROAD, FALLS CHURCH, VA
FUNCTION: HEALTHCARE
174 PRIVATE ROOMS
INTENSIVE CARE UNITS
SIZE: 236,000 SQ. FT.
147.55 FT
COST: 76MILLION $
DATE OF CONSTRUCTION : JULY 2010-AUGUST 2012
EDLIVERY METHOD: DESIGN-BID-BUILD
PROJECT PARTICIPANTS
OWNER: INOVA HEALTHCARE SYSTEM
GERNAL CONTRACTOR: TURNER CONSTRUCION COMPANY
ARCHITECT: WILMOT SANZ, INC.
MEP: RMF ENGINEERING, INC.
CIVIL: DEWBERRY & DAVIS LLC
STRUCTURE: CAGLEY & ASSOCIATES
ELECTRICAL: TURLAND SERVICE CORPORATION
STRCTURE:
CONCRETE STRUCTURE
TWO-WAY FLAT SLAB
TYPICAL 24IN. X 24IN. COLUMNS
12FLOORS ABOVE GRADE /1FLOOR BELOW GRADE
:MECHANICAL SYSTEM
5TH FLOOR WITH 4X 5,000 CFM AIR HANDLING UNITS
2 AIR HANDER FOR CAFETERIA AND KITCHEN ON WEST ROOF OF 2ND FLOOR 10,000CFM AND 13,000 CFM
3 HEAT EXCHANGER IN BASEMENT (715 GALLONS/MINS )
:ELECTRICAL SYSTEM
TWO 2,000KVA TRASFORMERS
2,000KW EMERGENCY GENERATOR
:FAÇADE
45,000 SF. ARCHITECTURAL PRECAST (INCLUDING 22,000SF. THIN BRICK-CLAD )
282 METAL PANELS GLAZED INTO ALUINUM CURTAIN WALL
:SUSTAINABILITY
LEED SILVER CERTIFICATION
GREEN ROOF, RAIN GARDEN
فهرست مطالب داخل این پاورپوینت:
- PROJECT OVERVIEW
- ANALYSIS #1: IMPLEMENTATION OF BIM
- PROBLEM IDENTIFICATION
- BIM SCORECARD
- BIM ROI
- INVESTIGATION OF BIM TOOLS
- CASE STUDY AND FEASIBILITY
- ANALYSIS #2: SHORT INTERVAL PRODUCTION SCHEDULES(SIPS)
- PROBLEM IDENTIFICATION
- IDENTIFY AREA FOR SIPS
- SMART ROOM
- SCHEDULE ACCELERATION
- ANALYSIS #3: NET ZERO ENERGY BUILDING SUSTAINABILITY
- PROBLEM IDENTIFICATION
- NZE BUILDING CERTIFICATION
- TOP STRATEGIES FOR ENERGY EFFICIENT HOSPITAL
- ELECTRICALBREADTH –DYNAMIC GLASS
- ANALYSIS #4: INTEGRATED PROJECT DELIVERY (IPD)
- PROBLEM IDENTIFICATION
- STUDY ON IPD GUIDE
- MULTI PRIME CONTRACTS
- SUMMARY AND CONCLUSION
- ACKNOWLEDGEMENTS